This unit (NNM6003) advances students' skills, capabilities and specialist knowledge in cable systems, types of system topologies, manufacturing practices and relevant standards. Students will investigate and resolve complex problems in overhead and underground design and construction of power distribution networks through the application of advanced theoretical knowledge, critical analysis and professionally-relevant practical skills. The uses and design parameters of equipment necessary for underground system design will be investigated. Subsequently, basic underground cable design practices are reviewed and installation practices for both transmission and distribution projects are justified. Relevant application concepts such as hydraulic pressures, commissioning and industry standards will be articulated. Students will also critically review and reflect on power delivery requirements (in voltage and megawatts) and the maximum outage limitations in order to survey the electrical, mechanical and environmental requirements for an Australian overhead line and underground cable.

Unit details

Location:
Study level:
Postgraduate
Credit points:
12
Unit code:
NNM6003

Learning Outcomes

On successful completion of this unit, students will be able to:
  1. Adapt specialist technical knowledge of cable systems, manufacturing practices and standards to a variety of current professional contexts;  
  2. Design and implement specifications for equipment needed for an underground system design;  
  3. Investigate underground cable design and installation practices for both transmission and distribution projects to optimise operational reliability and safety;  
  4. Critically reflect on specialised technical knowledge and skills to design for the electrical, mechanical and environmental requirements for Australian overhead lines;  
  5. Design and simulate an overhead line for a given Basic Insulation Line (BIL) and conduct transient analysis from a lightning and switching perspective;  
  6. Conceptually map and evaluate the key design aspects of overhead line construction and maintenance including OHS requirements and long-term operational regimes; and  
  7. Collaborate with others with responsibility and accountability for own learning in planning, problem solving and decision making in professional practice.  

Assessment

Assessment type Description Grade
Laboratory Work Lab reports 30%
Project Project 1 20%
Project Group Projects 2 30%
Presentation Group Presentation and Contribution 20%

Where to next?

VU takes care to ensure the accuracy of this unit information, but reserves the right to change or withdraw courses offered at any time. Please check that unit information is current with the Student Contact Centre.