This unit (CPCCBL2001) specifies the skills and knowledge required to safely handle bricklaying and blocklaying materials using manual and mechanical means. It includes sorting, stacking and protecting onsite materials.
This unit applies to those who carry out preparatory bricklaying and blocklaying work on new or existing structures. It is suitable for people with basic skills and knowledge who undertake routine work tasks under the direction of more experienced workers.
Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCCWHS1001 Prepare to work safely in the construction industry meets this requirement.
Unit details
Location:
Study level:
Vocational and further education (TAFE)
Unit code:
CPCCBL2001
Prerequisites
CPCCWHS2001 - Apply WHS requirements, policies and procedures in the construction industry
Contact VU Polytechnic
Find a different unit
Assessment
Assessment tasks will be designed to reinforce and extend knowledge and skill competence within set and controlled parameters in accordance with each unit's learning outcomes and performance criteria requirements, including the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.
Students will be expected to demonstrate the following required skills:
*use manual techniques to appropriately position a pallet of bricks and blocks to reflect the laying sequence of the project
*blend bricks and blocks from different pallets to achieve a balanced masonry finish
*produce consistent mortar mixes to a strength factor of M3 using the bucket gauging technique
*relocate a pallet of bricks using mechanical equipment
*stack bricks and blocks and load mortar boards on a raised platform.
Students will also be expected to demonstrate the following knowledge:
*terminology relating to bricklaying and blocklaying
*relevant building and construction standards and codes
*environmental requirements for workplace processes and waste disposal
*characteristics, applications and limitations of specified materials for bricklaying and blocklaying:
- clay bricks
- solid and hollow blocks
- pavers
- refractory bricks and mortars
- various natural and manufactured stone
- aggregates, cement, lime, mortar additives
*processes and techniques for:
- laying bricks and blocks
- mixing mortar
- manual handling
- mechanical handling
*functional and operational features of plant, equipment and hand and power tools:
- cement mixers
- brick cutting saw
- brick buggies
- elevators
- forklifts
- materials hoists
- pallet trolleys
- scaffolds
*workplace safety:
- job safety and environmental analysis (JSEA)
- hazardous manual tasks
- exposure to silica
- exposure to loud noise
- electrical hazards and the use of earth leakage boxes.
Where to next?
As part of a course
This unit is studied as part of the following courses. Refer to the course page for information on how to apply for the course.
VU takes care to ensure the accuracy of this unit information, but reserves the right to change or withdraw courses offered at any time. Please check that unit information is current with the Student Contact Centre.